DC Gcity
White-Cliffs-Cap-Blanc Dover-DC-Calais Bridge-Island-Port-Park
Rebuilding natural eroded connection between cliffs of Dover (White Cliffs) and Calais (Cap Blanc)
SandaeroBlock WhiteBlock FiberGlass Composite H2H2OSteam ZeroWeight WindThrough
White-Cliffs-Cap-Blanc
Dover-DC-Calais
Bridge-Island-Port-Park
Globocean
Free Zone
Gcities
Weather Neutral
35km Dover-Calais
Protected-Controlled
Green AeroPark
H2 + H2O AeroBlocks
Solar-Wind-Wave Energy
Start-Up Art-Tech-Hub
Residential-Commercial
Under-Above Water Units
Dover Calais
Globocean Green City
Zero Poverty ZeroTaxation
Free Social Economic Zone
England-France-EU-Globocean
WHITE CLIFFS
DOVER
ENGLAND
CAP BLANC
CALAIS
FRANCE
Under Level
Water Level
Dome Level
Sky Level
Ship
Through Ways
Hot
Beach Domes
Wind
Through Ways
Green
Park Ways
Restoring Sea Eroded
White Cliffs
Multi Level Weather
Prove Pathways
Fish
Farming
All Level
Real Estate
Dover White Cliffs
Shore Tower
Calais Cap Blanc
Tour de Rivage
DC Gcity
Tower and Island
Theme
Park
Global warming polar ice melting, brexit and sub-sea landslide tsunamis divided Dover White Cliffs from Calais Cap Blanc, separating Britain from Ireland and Europe. UL-EU, UL England and UL France AeroPark-Bridges Gcities will reconnect them, starting with an AeroTrain, a cabled airship, connecting new modern Dover White Cliffs Shore Tower and Calais Cap Blanc Tour de Rivage. United Kingdom, Crown, House of Lords, Anglican Church must be separated from government/state, self-financed private social-cultural-religious organization, with potential of multi billion revenues (voluntary charity/chivalry contributions, tourism, merchandising and multimedia rights). Other national monarchies must follow same model to uphold UN Art 1 Human Equal Rights.
Bridge
Eway
Lon Gcity
Tower and Island
Par Gcity
Tower and Island
To She Gcity
Island
To Ams Gcity
Island
To Bru Gcity
Island
NorthSea Dover-Calais
Aero-Train-Park-Bridge
1 Target
Aero-Train-Park-Bridge (Green Parks);
1TW AeroNet-energy (Wind-Solar-Wave);
1M Water Battery Aerocars from AeroFactory AeroHangars;
1M users AeroNet-communication (broad band optic fiber cable);
1M tons year Aerofarm-food (algae/fish, all crops 365 aeroponic modular farms);
1M cargo high-way ship/container port-train (under bridge AquaShip/AeroHook/Crain),
1M real estate units Home/Office/Store/Factory Art-Tech Global Incubator Universities;
1M passengers Aerotrain-transport (electric, 9min crossing, $1 seat, $9 cabin, $19 e-car);
1M units Aeroponic Natural Trees/Gardens and Artificial AeroTree (energy, compress gases);
1km Space-Port Electric Accelerator-Elevator cross-pyramid H2/H2O Aeroblock vertical-horizontal pile-up;
1M Mesambulances, 1k Mesclinics, 1 Meshospitals w/ IUI (Health), 1k Jusistem Stations (Security/Justice);
1 cross wing-Island Gcities; Weather-Manager Wind-Wave Stability flow through modular sphere aqua/aeroblock;
above/under water vertical/horizontal kiels/wings mirror-laser/wind-propeller, floor/sky pilars/cable anchors/floaters;
1M liters/day Drinking Water, Hydrogen, Oxygen Production (water heat/electrolisys, energy storage, fuel cell energy);
Building Phases: 1-Sandaerohangar 2-Sandaeroblocks 3-Sandaeronet 4-Sandaeroships 5-Sandaerotrain 6-Sandaerobridge.
GO Dover - GO Calais
UL England
UL France